Mess Project Construction Cost Analysis Using SNI 2013 and AHSP Methods

Authors

  • Dewi Fortuna Tamba Universitas Internasional Batam
  • Indrastuti Universitas Internasional Batam

DOI:

https://doi.org/10.37253/jcep.v5i1.9073

Abstract

The budget calculation is one of the most important aspects in a construction project, beside time and qualities. There are several methods that we can use to estimate how much material is needed, including SNI 2013 and AHSP method. However, these 2 methods have to be implemented meticulously to reduce overbudget and material wastage.  The data come from the list of working items that is used as a bid by the company owner, the standard given by the project manager, and items price list of each working part. The purpose of this research is to compare and find which method is the most effective in controlling the project expenditure. Also, researcher will explained how to calculate data as well as the advantage and weakness of both methods that have been mentioned above.

Downloads

Download data is not yet available.

References

E. Mawardi, I Iskandar, dkk, “Analisis Perbandingan Anggaran Biaya dengan Menggunakan Metode BOW, SNI, dan AHSP,” J. Teknik Sipil dan Lingkungan, vol. 5, no. 1, pp. 48-60, 2023, ISSN: 2715-4831 (online).

D. Siburian, W. Kritiana, dan V. P, “Analisis Estimasi Biaya Menggunakan Metode SNI 2017 dan AHSP 2016 (Studi Kasus: Proyek Pembangunan Gedung Kuliah Terpadu Universitas Palangka Raya),” J. Artikel, vol. 04 , pp. 138–143, 2017.

H. Siregar. S. Harahap, dan N. Puspita, “Analisis Perbandingan Nilai Harga Satuan Pekerjaan (AHSP) dengan Nilai Harga Standar Nasional Indonesia (SIN) pada Pekerjaan Pembangunan Gedung/Ruang Baru Puskesmas Padang Tinggi, Kota Padang, Sidempuan,” J. STATIKA, vol. 5, no. 1, pp. 60-70, 2022.

L. Sianto, M. Takdir, dan M. Maswanto, “Analisa Perbandingan Estimasi Anggaran Biaya Antara Metode SIN dan BOW pada Pekerjaan Talud Pantai Desa Talaga Besar,” J. SCEJ (Shell Civil Enginnering Journal), vol. 3, no. 1, pp. 39-47, 2018.

N. Alami, U. Aziz, dan D. Margiarti, “Studi Komparasi Perbandingan Rencana Anggaran Biaya Antara Metode Analisa Harga Satuan Pekerjaan (AHSP) dan Standar Nasional Indonesia (SIN),” J. Ilmu Teknik Sipil Surya Beton., vol. 5, no. 1, pp. 10-19, 2021.

T. Tahan, “Perbandingan Rencana Anggaran Biaya Antara Metode SNI 2010 dan Analisa Harga Satuan Pekerjaan,” J. Kacapuri: Jurnal Keilmuan Teknik Sipil., vol. 4, no. 2, pp. 379, 2021.

M. Kaisar dan Y. Lubis, “Perencanaan Anggaran Biaya Rumah Type Sederhana Menggunakan Analisa Harga Satuan Pekerjaan (AHSP) SNI 2017-2018,” J. Teknik Sipil (JTSIP)., vol. 1, no. 1, pp. 51-55, 2022.

A. Sani, “Cost Analysis of Concrete Structure Work Using AHSP Method (Case Study: Residential House Type 90/72),” Puwarupa Architect's Journal , vol. 4, no. 1985, pp. 39-46, 1994.

F. Roehman, “ANALISA HARGA SATUAN PEKERJAAN DENGAN METODE BOW, SNI, DAN LAPANGAN (Pekerjaan Beton Bertulang pada Pembangunan Rumah Tinggal Perum Bugel, Jepara),” J. Teknik - UNISFAT, vol. 7, no. 1, pp. 14-23, 2011.

K. Ratag, G. Malingkas, and J. Tjakra, “Perbandingan Rencana Anggaran Biaya Antara Metode SNI dengan Metode AHSP pada Proyek Gedung Pendidikan Fakultas Teknik,” J. Tekno, vol. 19, no. 79, pp. 299-305, 2021.

Downloads

Published

2024-06-30

Issue

Section

Articles