The Impact of a Defect List and Outstanding List in Expediting the Project Handover Process of PaxOcean’s New Building Centre

Main Article Content

Cayitho Calveen veen
Indrastuti

Abstract

At each stage of the construction project, a handover process will be carried out. The handover process in a project is the process of handing over the work results from the contractor to the owner. Before the handover process is carried out, a checking process is carried out on the quality of the project. So it is necessary to make a list of repair work and pending work. The aim of this research is to assess how much influence the use of the defect list method has. This research began with creating a defect list format and an outstanding list format. The data used in this research are the results of observations in the field in the form of problems that arise and work that has not been completed. The results of the research are details of problems that arise on the project and the influence of using the defect list and outstanding list on the project and from making comparisons to the influence of using the method. Accordingly, the results of this research show that there is a positive influence from using the defect list and outstanding list methods.

Downloads

Download data is not yet available.

Article Details

Section
Articles

References

[1] M. R. A. &. B. A. T. Simanjuntak, "Kajian faktor–faktor manajemen pembiayaan proyek dalam implementasi BIM pada proyek bangunan gedung.," pp. 411-416., 2020.
[2] S. T. J. &. S. M. Asnuddin, "Penerapan Manajemen Konstruksi Pada Tahap Controlling Proyek.(Studi Kasus: Bangunan Laboratorium Fakultas Teknik Universitas Sam Ratulangi Manado).," Jurnal Sipil Statik, 2018.
[3] S. &. R. A. Perdana, "Penerapan Manajemen Proyek dengan Metode CPM (Critical Path Method) pada Proyek Pembangunan SPBE.," Amaliah: Jurnal Pengabdian Kepada Masyarakat, pp. 242-250., 2019.
[4] H. Kerzner, Project management metrics, KPIs, and dashboards: a guide to measuring and monitoring project performance, John Wiley & Sons., 2022.
[5] D. &. Z. Z. Daryanto, "Studi Kelayakan Investasi Proyek Perumahan Melalui Skema Akuisisi Proyek Mangkrak:(Studi Kasus Perumahan Bukit SKM Residence, Pengembang PT. NYG).," Jurnal Ekonomi Utama, pp. 114-118., 2022.
[6] A. F. &. T. A. T. Romadhon, "Analisis Faktor-Faktor Penyebab Keterlambatan Kerja Pada Proyek Pembangunan Gedung Bertingkat Di Indonesia.," Jurnal Proyek Teknik Sipil, pp. 18-27., 2020.
[7] R. L. &. L. I. S. Kliem, "Reducing project risk. Routledge," 2019.
[8] A. B. &. S. M. A. Siswanto, Manajemen Proyek., CV. Pilar Nusantara., 2019.
[9] T. S. &. S. S. Diharjo, "Analisis Manajemen Konstruksi Pembangunan Ruko Grand Orchard Cirebon.," Jurnal Konstruksi dan Infrastruktur,, 2020.
[10] A. A. &. W. S. Simatupang, "PENGENDALIAN MUTU PEKERJAAN STRUKTUR ATAS PROYEK KINGLAND," In Prosiding Seminar Nasional Teknik Sipil, 2022.
[11] A. S. Ariyanto, "Analisis Jenis Kerusakan Pada Bangunan Gedung Bertingkat (Studi Kasus pada Gedung Apartemen dan Hotel Candiland Semarang).," Bangun Rekaprima: Majalah Ilmiah Pengembangan Rekayasa, Sosial dan Humaniora, 6(1, April), , pp. 45-57., 2020.
[12] A. H. A. Y. U. &. B. R. A. Rizal, "FAKTOR-FAKTOR PENGHAMBAT YANG BERPENGARUH TERHADAP KINERJA WAKTU PELAKSANAAN PROYEK PEMBANGUNAN GEDUNG.," Jurnal Teknik Sipil, pp. 12(1), 99-112., 2023.
[13] T. &. J. S. Rahmanto, "Pengendalian Biaya dan Waktu dengan Metode Earned Value Proyek Familia Urban Bekasi.," Jurnal Teknik Sipil Cendekia (JTSC, pp. 331-342., 2022.
[14] Y. &. S. B. Yalid, "Penerapan Sertifikat Laik Fungsi Bangunan Gedung di Kecamatan Pangkalan Kerinci, Kabupaten Pelalawan.," Jurnal Ilmiah Hukum dan Hak Asasi Manusia, pp. 2(1), 1-13., 2022.
[15] M. A. R. &. S. R. A. Simanjuntak, "KAJIAN FAKTOR DAN VARIABEL CONSTRUCTION PUNCH-LIST PADA BANGUNAN GEDUNG BERTINGKAT DI PROYEK ABC.," pp. 545-553., 2020.
[16] U. &. D. N. Umar, "Metode Pengendalian Jadwal Pembangunan Pelabuhan dengan Kombinasi Barchart dan Network Planning Studi Kasus Proyek PT. DOK Warisan Pertama.," Journal Of Civil Engineering And Planning (JCEP), , Vols. 3(1),, pp. 81-93, 2022.
[17] W. Sudarson, "EVALUASI PENJADWALAN PROYEK DENGAN METODE LINE OF BALANCE (STUDI KASUS : HOTEL SANTIKA BATAM)," Journal Of Civil Engineering And Planning (JCEP), vol. 1(2), pp. 92-98, 2020.
[18] M. A. R. &. S. R. A. Simanjuntak, "KAJIAN FAKTOR DAN VARIABEL CONSTRUCTION PUNCH-LIST PADA BANGUNAN GEDUNG BERTINGKAT DI PROYEK ABC.," pp. 545-553., 2020.