Analysis Of Project Scheduling Using The CPM Method (Case Study Of Prayer Room Construction In PT. X Empalecement Complex)

Try Sugiyarto Soeparyanto, Ridwasyah Nuhun, Annisa, Yusran, Hendra Ariatno, La Ode Muh. Zulfitrah

16-24

Analysis of Lateral Force and Base Shear Due to Earthquake Loads Based on Yield Point Spectra

Goldelfridus Alfredo Abani, Krisantos Ria Bela, Krisantus Satrio Wibowo Pedo

25-35

Application of the Least Cost Analysis Method to Determine the Optimal Cost and Duration for Delayed Projects