Analysis Of Project Scheduling Using The CPM Method (Case Study Of Prayer Room Construction In PT. X Empalecement Complex)
DOI:
https://doi.org/10.37253/jcep.v5i1.9206Abstract
In a construction project work, it is necessary to control time, quality and costs. This control is necessary to obtain work results that are in accordance with planning. The aim of this research is to determine the results of the analysis of the application of the Critical Path Method (CPM) to time scheduling on the prayer room construction project at the PT emplacement complex. X. The results of this research show that with the CPM method, the project completion time is determined within 26 weeks. Critical incidents obtained include preparation work (A), earth work (B), concrete work (C), roof and ceiling work (E), electrical work (H), painting work (I), and site cleaning (J). . The critical path consists of two paths, namely 1-2-3-4-6-9-10-11 and 1-2-3-4-5-8-9-10-11.
Downloads
References
J. Santony, “Simulasi Penjadwalan Proyek Pembangunan Jembatan Gantung dengan Metode Monte Carlo,” Jurnal Informasi dan TeknologiI, vol. 2, No. 1, pp. 36–42, Juni 2020, doi: 10.37034/jidt.v2i1.34.
R. Yoanda, D. Pramono, and B. S. Prakoso, “Pengembangan Sistem Informasi Manajemen Konstruksi pada PT. AA Bersaudara,” Jurnal Pengembangan Teknologi Informasi dan Ilmu Komputer, vol. 7, no. 2, pp. 696-701, 2023. [Online]. Available: http://j-ptiik.ub.ac.id
M. Syamsul Maarif, A. Rosytha, and Z. Rasullia Kamandang, “Analisis Penjadwalan Proyek Dengan Metode PERTAMA Dan CPM Pada Pembangunan Gedung Hotel Di Sidoarjo," AGREGAT, vol. 7, no. 1, Mei 2022.
M. Priyo and S. Sudiro, “Studi Optimasi Waktu dan Biaya dengan Metode Time Cost Trade Off pada Proyek Konstruksi: Studi Kasus Proyek Jalan Bugel-Galur-Poncosari Cs. Tahap I, Provinsi D.I. Yogyakarta,” JURNAL ILMIAH SEMESTA TEKNIKA, vol. 20, no. 2, pp. 172–186, 2017.
F. Nabila, “Analisis Optimasi Waktu dan Biaya pada Konstruksi Bangunan Gedung Menggunakan Metode Time Cost Trade Off,” Journal of Civil Engineering and Planning, vol. 4, no. December, 2023, doi: 10.37253/jcep.v4i2.8662.
S. Ulfa and E. Suhendar, “Implementasi Metode Critical Path Method Pada Proyek Synthesis Residence Kemang,” Journal Optimasi Teknik Industri, vol. 03, no. 01, pp. 1-6, 2021.
P. Wibowo and N. Rozy, “JURNAL KONSTRUKSI ANALISIS MANAJEMEN KONSTRUKSI PEMBANGUNAN GEDUNG RAWAT INAP KELAS III RSUD WALED KABUPATEN CIREBON,” JURNAL KONSTRUKSI, vol. ix, no. 2, April 2020.
G. Padma Arianie and N. Budi Puspitasari, “PERENCANAAN MANAJEMEN PROYEK DALAM MENINGKATKAN EFISIENSI DAN EFEKTIFITAS SUMBER DAYA PERUSAHAAN (Studi Kasus : Qiscus Pte Ltd),” Jurnal Teknik Industri, vol. 12, no. 3, pp. 189-196, September 2017.
D. Asmaroni and F. Zabadi, “Productivity Analysis of Construction Workers During The Tobacco GrowingSeason in Sampang Regency,” Journal of Civil Engineering and Planning, vol. 4, no. 1, pp. 82–93, 2023, doi: 10.37253/jcep.v4i1.7776.
S. Hadi and S. Anwar, "Proyek Analisis Manajemen Pelaksanaan Proyek Pembangunan Laboratorium Fakultas Ekonomi UNSOED," JURNAL KONSTRUKSI, vol. vii, no. 2, Januari 2018.
Y. R. Pratiwi, M. Indrayadi, and Rafie, “Sistem Informasi Manajemen Dalam Pengendalian Proyek (Studi Kasus Pada Pekerjaan Pembangunan Gedung Polresta Pontianak),” JeLAST J. PWK, Laut, Sipil, Tambang, vol. 7, no. 3, pp. 1–7, 2020.
R. Rahmatullah, A. F. R. L, S. Bachmid, W. Watono, and S. F. Arsal, “Perbandingan Critical Path Method (CPM) dengan Program Evaluation and Review Technique (PERT) Terhadap Penjadwalan Waktu Proyek,” JURNAL TEKNIK SIPIL MACCA, vol. 7, no. 2, pp. 157–167, 2022, doi: 10.33096/jtsm.v7i2.660.
T. R. Permatasari, L. B. Setyaning, and U. A. Aziz, “Analisis Penjadwalan Menggunakan Metode Critical Path Method ( CPM ) pada Pembangunan Gedung Dindikbud Kabupaten Purworejo,” Jurnal Surya Beton, vol. 7, pp. 169–175, 2023.
D. Septiawan, “Analisis Penerapan Metode Critical Path Method Pada Proyek Pengadaan Furniture Masjid di Jepera Inti Kreasindo,” Scientifict Journal of Industrial Engineering, vol. 1, no. 2, September 2020.
H. Rahsa Pramesti, A. Budi Listyawan, J. A. Yani Tromol, and J. Tengah, “Prosiding Seminar Nasional Teknik Sipil 2023 ANALISA PENGENDALIAN WAKTU DENGAN METODE CRITICAL PATH METHOD (CPM) PADA PROYEK PEMBANGUNAN PONDOK IQRO’, SURAKARTA”.
Downloads
Published
Issue
Section
License
Copyright (c) 2024 Try Sugiyarto Soeparyanto, Ridwasyah Nuhun, Annisa, Yusran, Hendra Ariatno, La Ode Muh. Zulfitrah
This work is licensed under a Creative Commons Attribution 4.0 International License.