Productivity Analysis of Construction Workers During The Tobacco Growing Season in Sampang Regency

Authors

  • Dedy Asmaroni Program Studi Teknik Sipil, Fakultas Teknik, Universitas Madura
  • Fairuz Zabadi Program Studi Teknik Sipil, Fakultas Teknik, Universitas Madura

DOI:

https://doi.org/10.37253/jcep.v4i1.7776

Keywords:

Labor Productivity, Cement Concrete Pavement Fc' 25 Mpa Wiremesh (M8).

Abstract

Labor productivity is one of the main elements in determining the successful implementation of a construction project, one of the jobs that require a productive workforce is Fc' 25 Mpa Wiremesh Cement Concrete Pavement (M8). This research was conducted with the aim of knowing the level of productivity in Cement Concrete Pavement Fc' 25 Mpa Wiremesh and then compared with AHSP Bina Marga 2022 or Permen PUPR RI No. 1 of 2022 and mentions the solutions provided to the obstacles in the field during the implementation of the Fc' 25 Mpa Wiremesh Cement Concrete Pavement project in the field. The results obtained from the average calculation of the analysis of the work productivity of Cement Concrete Pavement Fc' 25 Mpa Wiremesh on the Karang Dalem – Patarongan Road Improvement project in Sampang District obtained the calculation results of 30.77 m3/OH for the foreman and 30.81 m3/ OH for workers, while the calculation of AHSP Bina Marga 2022 yields 20.75 m3/OH for foremen and 33.43 m3/OH for workers. In the Torjun – Pangarengan Road Improvement project in Torjun District, the calculations obtained results of 31.94 m3/OH for the foreman and 32.10 m3/OH for the workers, while the 2022 AHSP Bina Marga calculation obtained results of 20.75 m3/OH for the foreman and 37, 05 m3/OH for workers. Furthermore, in the East Tobai – Poreh Road Improvement project in Sokobanah District, the calculation results obtained were 20.32 m3/OH for foremen and 20.30 m3/OH for workers, while the 2022 AHSP Bina Marga calculations obtained results of 20.75 m3/OH for foremen and 32.27 m3/OH for workers. In general, the obstacles encountered in the implementation of the concrete road project in Sampang district during the tobacco growing season were the hot weather, labor motivation, and the distance of the cast supplier from the project work location.

Downloads

Download data is not yet available.

Downloads

Published

2023-06-27

Issue

Section

Articles