Cost and Time Optimization Analysis using the Time Cost Trade Off Method

Authors

  • Putri Ayu Dwiyana Institut Teknologi Sumatera
  • Siti Agmaliza Institut Teknologi Sumatera
  • Rajiman Institut Teknologi Sumatera

DOI:

https://doi.org/10.37253/jcep.v6i2.11446

Keywords:

Time Cost Trade Off, efficiency, acceleration, time, labor

Abstract

The implementation of construction projects often faces delays that are difficult to avoid, as experienced in the construction of the City X Hospital Building, where there was a discrepancy between the initial plan and actual field implementation, resulting in a two-week delay in weekly progress. This study aims to analyze time and cost efficiency and compare the effectiveness of alternatives between extending working hours and adding labor using the Time Cost Trade Off method. This research is comparative, comparing the total cost and duration of the project for both acceleration alternatives. The total project cost under normal conditions was recorded at IDR 7,289,386,643.45 with a duration of 86 days until the completion of the third floor. The analysis shows that extending working hours by 1 to 4 hours resulted in costs of IDR 14,584,817,481; IDR 21,871,659,072; IDR 28,672,701,971; and IDR 34,564,808,294, with cost efficiency of –100.08%, –200.05%, –293.35%, and –374.18%, respectively. The project duration was reduced to 64, 50, 41, and 36 days, with time efficiency of 26%, 42%, 53%, and 58%. Meanwhile, the alternative of adding labor resulted in a total cost of IDR 13,660,989,499 with a cost efficiency of –87.41% and a project duration of 64 days (26% time efficiency). Based on these results, both extending working hours by one hour and adding labor showed the most efficient outcomes, but overall, adding labor was considered more optimal as it achieved the same acceleration with the lowest total cost.

Downloads

Download data is not yet available.

References

Saragi TE, Situmorang RU. Optimasi waktu dan biaya percepatan proyek menggunakan metode time cost trade off dengan alternatif penambahan tenaga kerja dan jam kerja (lembur)(studi kasus: pembangunan gedung convention hall Kab. Deli Serdang). Jurnal Construct. 2022 May 19;1(2):53-69.

Abrinaldi FH, Nurcahyo CB. Analisis Faktor Penyebab Keterlambatan pada Proyek Pembangunan Fasilitas Perkeretaapian Manggarai sd Jatinegara (Paket A) Tahap II" Main Line 1". Jurnal Teknik ITS. 2022 Dec 12;11(3):D132-7.

Laksana BI, Wjatmiko I, Hasyim MH. Aplikasi Metode Time Cost Trade Off Untuk Mengoptimalkan Waktu dan Biaya Pekerjaan Proyek Pada Pembangunan Gedung Pengairan Universitas Brawijaya. Jurnal Mahasiswa Jurusan Teknik Sipil. 2017;1(3):1209-14.

J. Launuru, L. Leuhery, and M. Marantika, “Optimasi waktu dan biaya dengan metode Time Cost Trade Off pada proyek pembangunan ruang kelas baru MTSN 6 Malteng,” Journal Agregate, vol. 3, no. 1, pp. 195–203, 2024. DOI: https://doi.org/10.31959/ja.v3i1.1907

I. Hendriyani, R. Pratiwi, and N. Qadri, “Optimasi waktu dan biaya pada pelaksanaan proyek peningkatan jalan Bina Bakti Kelurahan Gunung Seteleng Kabupaten Penajam Paser Utara dengan metode Time Cost Trade Off (TCTO),” Jurnal Transukma, vol. 3, no. 1, pp. 66–76, 2020. DOI: https://doi.org/10.36277/transukma.v3i1.72

S. Usman, A. H. Muhammad, I. Adjam, and I. Altarans, “Optimasi biaya dan waktu pelaksanaan proyek konstruksi dengan penambahan jam kerja dan penambahan tenaga kerja menggunakan metode Time Cost Trade Off (Studi Kasus: Proyek Pembangunan Gedung Islamic Center Halmahera Tengah),” Jurnal Teknik, vol. 16, no. 1, pp. 17–31, 2023.

Y. A. Jati and P. N. Rasyid, “Analisis optimasi biaya dan waktu proyek dengan penambahan jam kerja menggunakan metode Time Cost Trade Off pada proyek pembangunan gedung rumah sakit type D Mijen Semarang,” Laporan Tugas Akhir, 2021.

C. G. Salindeho, P. A. K. Pratasis, and F. P. Y. Sumanti, “Optimasi waktu dan biaya menggunakan metode Time Cost Trade Off pada proyek peningkatan ruas jalan Tondano–Kembes–Manado seksi II,” Jurnal TEKNO, vol. 20, no. 81, pp. 135–143, 2022. DOI: https://doi.org/10.35793/jts.v20i81.42087

L. T. N. Wulan, I. Mirajhusnita, and S. Luthfianto, “Analisis optimasi waktu dan biaya dengan penambahan jam kerja (lembur) menggunakan metode Time Cost Trade Off,” Jurnal Teknik Sipil, vol. 1, no. 2, pp. 47–56, 2021. DOI: https://doi.org/10.24905/jureng.v12i2.73

Fardila, D., & Adawyah, N. R. Optimasi Biaya dan Waktu Proyek Konstruksi dengan Lembur dan Penambahan Tenaga Kerja. INERSIA Lnformasi Dan Ekspose Hasil Riset Teknik Sipil Dan Arsitektur, 17(1), 35–46. 2021, DOI: https://doi.org/10.21831/inersia.v17i1.39499

L. Setiawan and J. S. Tamtana, “Analisis percepatan durasi pekerjaan basement semi top down dengan metode Time Cost Trade Off,” Jurnal Mitra Teknik Sipil, vol. 3, no. 1, pp. 143–154, 2020. DOI:10.24912/jmts.v3i1.6974

Soeparyanto, T.S., Nuhun, R., Ariatno, H. and Zulfitrah, L.O.M., 2024. Analysis Of Project Scheduling Using The CPM Method (Case Study Of Prayer Room Construction In PT. X Empalecement Complex). Journal of Civil Engineering and Planning (JCEP), 5(1), pp.16-24. 2024. DOI: https://doi.org/10.37253/jcep.v5i1.9206

F. Nabila, “Analisis Optimasi Waktu dan Biaya pada Konstruksi Bangunan GedungMenggunakan Metode Time Cost Trade Off,” Journal Of Civil Engineering And Planning, Vol. 4, No. 2, Pp. 2747-6299, Des. 2023, Doi: https://doi.org/10.37253/jcep.v4i2.8662.

H. Kerzner, “Project Management: A Systems Approach to Planning, Scheduling, and Controlling (12th ed.)” John Wiley & Sons. 2017.

S. V. C Wijaya & Yudo, H., Mulyanto, I. P. Analisa Penerapan Metode Time Cost Trade Off dalam Optimasi Proyek Reparasi Kapal MT Poka Jo. Jurnal Teknik Perkepalan, 12(2). 2024.

Downloads

Published

2025-12-22

Issue

Section

Articles