Cost and Time Performance Evaluation Based on Earned Value Analysis Method

Authors

  • Laila Putri Rahmadani Institut Teknologi Sumatera
  • Junita Eka Susanti Institut Teknologi Sumatera
  • Putri Ayu Dwiyana Institut Teknologi Sumatera

DOI:

https://doi.org/10.37253/jcep.v6i1.10691

Keywords:

Biaya, waktu, ACWP, BCWP, BCWS

Abstract

The execution of construction projects frequently encounters a range of challenges in the field, leading to deviations between the initial project plan and actual implementation, particularly in terms of time and cost performance. Such deviations may significantly affect the overall efficiency and effectiveness in achieving the intended project objectives. Consequently, there is a critical need for an evaluation method capable of providing a comprehensive and real-time assessment of project performance. This study aims to evaluate the performance of an infrastructure development initiative, namely the ABC toll road construction project, by employing the Earned Value Analysis (EVA) method. EVA integrates three key components—cost, schedule, and work performance—offering a quantitative framework to assess both cost efficiency and schedule adherence. The performance weights used in this study are derived from both planned values and actual on-site progress to reflect the true execution status. The data utilized in the analysis include the Budget Plan (Rencana Anggaran Biaya/RAB), planned S-curve, and weekly progress reports obtained during project implementation. The findings at the 67th week of project execution indicate an Actual Cost of Work Performed (ACWP) of Rp1,231,597,458,600.00, a Budgeted Cost of Work Performed (BCWP) of Rp1,109,547,260,000.00, and a Budgeted Cost of Work Scheduled (BCWS) of Rp1,570,000,000,000.00. The Cost Performance Index (CPI) value of 0.901 indicates that the project experienced a cost overrun of 9.9% compared to the planned budget (CPI < 1 signifies cost inefficiency). 

References

[1] I. K. A. Ariana And D. A. Lestari, “Analisis Kinerja Proyek Optimalisasi Spam Gatak Kabupaten Sukoharjo Dengan Metode Earned Value,” Journal Of Integrated System, Vol. 6, No. 1, Pp. 87–102, Jul. 2023, Doi: 10.28932/Jis.V6i1.6521.

[2] T. A. Billah, A. Abdullah, And A. T. Bulba, “Analisis Faktor-Faktor Yang Mempengaruhi Triple Constraints Proyek Konstruksi Gedung Di Provinsi Aceh Dalam Masa Pandemi Covid 19,” Teras Jurnal : Jurnal Teknik Sipil, Vol. 13, No. 1, P. 99, Mar. 2023, Doi: 10.29103/Tj.V13i1.839.

[3] Lirawati And L. A. Megawati, “Analisis Faktor Keterlambatan Proyek Konstruksi Bangunan Gedung,” 2020.

[4] J. V. B. Ginting, “Metode Earned Value Pada Pengendalian Proyek Pembangunan Gedung Sekolah Sd Methodist-An Pancur Batu,” 2020.

[5] F. Nabila, “A Analysis Of Time And Cost Optimization In Building Contruction Using Time Cost Trade Off Method,” Journal Of Civil Engineering And Planning, Vol. 4, No. 2, Pp. 199–210, Dec. 2023, Doi: 10.37253/Jcep.V4i2.8662.

[6] W. I. Pamungkas And A. Andreas, “Analisis Biaya Dan Waktu Proyek Dalam Proses Kinerja Dengan Menggunakan Metode Earned Value Studi Kasus: Proyek Rancang Bangun Rumah Susun Stasiun Pondok Cina (Analysis Of Project Costs And Time In Process Performance With Using The Earned Value Method Design And Build Project Of Pondok Cina Station Flats ),” 2021.

[7] T. S. Soeparyanto, R. Nuhun, A. Annisa, Y. Yusran, H. Ariatno, And L. O. M. Zulfitrah, “Analysis Of Project Scheduling Using The Cpm Method (Case Study Of Prayer Room Construction In Pt. X Empalecement Complex),” Journal Of Civil Engineering And Planning, Vol. 5, No. 1, Pp. 16–24, Jun. 2024, Doi: 10.37253/Jcep.V5i1.9206.

[8] R. A. Saputra, D. A. Nugroho, R. Yulianto, And R. B. Jakaria, “Analisis Biaya Proyek Dengan Metode Earned Value Pada Pengerjaan Proyek Pembangunan Gudang Finishgood Pt. Landkrone,” Jurnal Multidisiplin Saintek, Vol. 01, Pp. 21–31, 2023.

[9] E. Wahyuni And B. Hendrawan, “Analisis Kinerja Proyek ‘Y’ Menggunakan Metode Earned Value Management (Studi Kasus Di Pt Asian Sealand Engineering),” 2018.

[10] A. Castollani, S. Puro, * Maiko, And L. Dewa, “Analisis Biaya Dan Waktu Pada Proyek Apartemen Dengan Metode Earned Value Concept,” Jurnal Rekayasa Konstruksi Mekanika Sipil (Jrkms), Vol. 3, No. 1, 2020.

[11] S. Nandaprasetya And A. Dofir, “Analisis Pengendalian Biaya Dan Waktu Pada Proyek Pemeliharaan Trotoar Jalan Di Provinsi Dki Jakarta (Trotoar Pasar Rebo) Menggunakan Metode Earned Value (Analysis Of Cost And Time Management Of The Sidewalk Maintenance Project In Dki Jakarta (Pasar Rebo Sidewalk) Using Earned Value Method),” 2021.

[12] F. Pratama, R. Waluyo Jurusan, And V. Happy Puspasari, “Analisis Kinerja Proyek Peningkatan Jalan Pelantaran-Parenggean-Tumbang Sangai Dengan Metode Earned Value,” 2019.

[13] E. Rita, N. Carlo, And D. Nandi, “Penyebab Dan Dampak Keterlambatan Pekerjaan Jalan Di Sumatera Barat Indonesia,” Jurnal Rekayasa, Vol. 11, No. 01, Pp. 27–37, 2021.

Downloads

Published

2025-06-24

Issue

Section

Articles