Linear Scheduling Method or Line of Balance (LSM/LOB) Scheduling Analysis for Devely Residence Housing, Batam City
DOI:
https://doi.org/10.37253/leader.v1i1.7661Keywords:
Line of Balance, Penjadwalan Waktu Proyek, Pekerjaan RepetitifAbstract
Project time scheduling is one of the keys to the success of a project. With the project scheduling, project activities can run effectively and smoothly. There are several project scheduling methods commonly used in construction projects. One of them is the Line of balance method. Line of balance method is one of the methods that is suitable on projects that have repetitive work. In this research, the author takes a case study on the Devely Residence housing project in Batam City. There are as many as 220 housing units in this project. From the results of the research conducted, it shows that the Line of Balance method can be used in repetitive projects such as housing in Development Residence. The result shows that by using this method, the 220-unit Devely Residence project can be completed in 349 days. Whereas in real implementation in the field, this project is completed within 365 days. Thus, there is a 16-day difference in project completion.
Downloads
References
[2] Arianto, A. (2010). Eksplorasi Metode Bar Chart, Cpm, Pdm, Pert, Line Of Balance dan Time Chainage Diagram dalam Penjadwalan Proyek Konstruksi.
[3] Aulia, M. A., Farisi, A. H., Wibowo, M. A., & Hidayat, A. (2016). Analisis Penggunaan Metode Penjadwalan Line Of Balance Pada Proyek Konstruksi Repetitif (Studi Kasus : Proyek Pembangunan Apartemen Candiland-Semarang (Vol. 5, Issue 2). Halaman.
[4] Bhaskara, A., Maulana, F. M., & Masagala, A. M. (2021). Analisis Penjadwalan Waktu dan Biaya Proyek Dengan Menggunakan Linear Scheduling Method .
[5] Faisol. (2010). Mata Kuliah Perencanaan, Penjadwalan dan Pengendalian Proyek. Universitas Islam Indonesia.
[6] Heizer, J., & Render, B. (2006). Manajemen Operasi, Edisi 7. Jakarta: Salemba Empat. .
[7] Hinze. (2008). Optimzation with PDE Constrain . Hamburg University.
[8] Husen, A. (2009). Manajemen Proyek (Perencanaan Penjadwalan dan Pengendalian Proyek). Andi Yogyakarta.
[9] Kenley, R. (2009). Location Based Management for Construction. Amazon.
[10] Lestari, D., & Siswanto, A. B. (t.t.). Penerapan Metode Line of Balance pada Pembangunan Perumahan ( Studi Kasus pada Perumahan Permata Puri Ngaliyan Semarang ).
[11] Rimasari, V., & Nugraheni, F. (t.t.). Analisis Penjadwalan Ulang dengan Menggunakan Metode Lsm (Linier Scheduling Method/ Line Of Balance) Pada Proyek Perumahan (Rescheduling Analysis With Lsm/Lob Method In The Housing Project.
[12] Setianto, A. (2004). Studi Perbandingan Metode BarChart dengan Line of Balance Dalam Penjadwalan Kegiatan Pembangunan Perumahan. Universitas Islam Sultan Agung.
[13] Sinaga, R., & Simanjuntak, P. (2021). Analisis dan Penerapan Metode Line Of Balance Pada Proyek Repetitif (Studi Kasus: Proyek Pembangunan Gedung Kementerian Keuangan Bandar Lampung). Journal CENTECH, 2(2), 82–89.
[14] Syayuti. (2015). Optimalisasi Waktu dan Biaya dengan Linear Scheduling Method Pada Proyek Pembangunan Gedung Arsip Dinas Pekerjaan Umum Kalimantan Tengah di Palangka Raya. 8.
[15] Utani, A., & Nugraheni, F. (2018). Analisa Penjadwalan Waktu Pelaksanaan Proyek Menggunakan Metode LSM (Linier Scheduling method).
[16] Pamadi, M., Umar, Usmanul H., Chen, N. (2022). Analisis Perbandingan Penjadwalan Proyek dengan Aktual Proyek Menggunakan Metode EVA (Earned Value Analysis) Pada Pembangunan Ruko 3 Lantai (Studi Kasus : Proyek Pembangunan Ruko De Monde Junction – Pasir Putih). Journal of Civil Engineering and Planning (JCEP).
[17] Sudarson, W. (2020). Evaluasi Penjadwalan Proyek Dengan Metode Line Of Balance (Studi Kasus : Hotel Santika Batam). Journal of Civil Engineering and Planning (JCEP), 1(2), 85-91.
[18] Umar, Usmanul H., Dzuraida, N. (2022). Metode Pengendalian Jadwal Pembangunan Pelabuhan dengan Kombinasi Barchart dan Network Planning Studi Kasus Proyek PT. DOK Warisan Pertama. Journal of Civil Engineering and Planning (JCEP), 3(1), 75-87.
[19] Umar, Usmanul H., Putra, W.M. (2020). Estimasi Waktu untuk Pengadaan Material Berdasarkan Time Schedule pada Proyek Pembangunan Ruko Kawasan SP Plaza Batu Aji. Journal of Civil Engineering and Planning (JCEP), 2(1), 46-52.