Boosting Boosting Rigid Pavement Productivity: Lessons from Experience and Working Hours on the Bengkulu Toll Road Project
DOI:
https://doi.org/10.37253/leader.v3i4.11260Keywords:
Experience, Productivity, Perkerasan jalan , perkerasan kaku, rigid pavement, working hoursAbstract
Rigid pavement work was a key component in toll road construction that played a strategic role in the speed of project completion. Two important internal factors that affected productivity were experience and working hours. Mismanagement of either of these factors could cause project delays. This study aimed to analyze the significance of the influence of work experience and working hours on the productivity of rigid pavement work in the Trans-Sumatra Toll Road project, Bengkulu–Lubuklinggau Section 3. The research method used was a quantitative approach with multiple linear regression analysis. Primary data were obtained from daily work reports that recorded the area of concrete coverage, working hours, and worker experience. The results of the classical assumption tests showed that the regression model met the requirements of normality, multicollinearity, and heteroscedasticity. The partial test (t-test) showed that experience had a significant positive effect on productivity (Sig. = 0.000), while working hours had a significant negative effect (Sig. = 0.021). The simultaneous test (F-test) yielded Sig. = 0.000 with an R value of 0.608, meaning that the variables of experience and working hours together influenced productivity by 60.8%. The average productivity value was recorded at 91.05 m²/hour with a high variance (variance = 391.545), which reflected the actual conditions on-site and indicated the significant influence of both external and internal factors. This finding underscored the importance of effective human resource management and optimal work schedule arrangements to enhance the performance of rigid pavement construction on toll road projects.
Downloads
References
[1] N. S. F. Arofah, ‘Pengaruh Pembangunan Infrastruktur Dasar Terhadap Pertumbuhan Ekonomi di Indonesia’, Jurnal Pendidikan Ekonomi Indonesia, vol. 3, no. 2, Art. no. 2, Oct. 2021, doi: 10.17509/jpei.v3i2.31443.
[2] R. A. Putri and I. P. Firdaus, ‘Dampak Pengoperasian Jalan Tol Trans Sumatra (JTTS) Terhadap Dinamika Pertumbuhan Ekonomi Pulau Sumatra’, Jurnal Jalan Jembatan, vol. 42, no. 1, June 2025, doi: 10.58499/jatan.v42i1.1347.
[3] J. Styer, L. Tunstall, A. Landis, and J. Grenfell, ‘Innovations in Pavement Design and Engineering: A 2023 Sustainability Review’, Heliyon, vol. 10, no. 13, p. e33602, July 2024, doi: 10.1016/j.heliyon.2024.e33602.
[4] J. Choi and H.-G. Ryu, ‘Statistical Analysis of Construction Productivity for Highway Pavement Operations’, KSCE Journal of Civil Engineering, vol. 19, no. 5, July 2015.
[5] A. M. Sikana, ‘Metode Pelaksanaan Dan Produktivitas Alat Pekerjaan Perkerasan Kaku (Rigid Pavement) dengan Slipform Concrete Paver pada Sta. 1+000 s/d 1+400 Proyek Pembangunan Jalan Tol Solo-Yogyakarta-NYIA Kulon Progo Seksi 1 Paket 1.1 Solo-Klaten’, Universitas Gadjah Mada, 2023.
[6] F. Armando and A. Nursin, ‘Produktivitas Rencana Dengan Aktual Pekerjaan Rigid Pavement Dengan Slipform Concrete Paver (Studi Kasus Jalan Tol Kayuagung – Palembang - Betung Seksi 3B)’, MoDuluS: Media Komunikasi Dunia Ilmu Sipil, vol. 4, p. 61, Dec. 2022, doi: 10.32585/modulus.v4i2.2766.
[7] G. Hendri, ‘Analisis Produktivitas Alat Berat Pada Pekerjaan Rigid Pavement Pada Proyek Jalan Tol Trans Sumatera Ruas Indrapura Kisaran Sta 2+000 - 3+000’, Thesis, 2024.
[8] C. Purnamasari and A. Nataadmadja, ‘Development of Pavement Deterioration Model for Rigid Pavement (Case Study: Cikopo-Palimanan Toll Road)’, E3S Web of Conferences, vol. 426, Sept. 2023, doi: 10.1051/e3sconf/202342602090.
[9] A. Mujiburrokhman, ‘Kajian Produktivitas Pekerjaan Pengecoran Rigid Pavement (Studi Kasus: Proyek Jalan Tol Trans Sumatera Ruas Lubuk Linggau – Curup – Bengkulu Seksi Bengkulu – Taba Penanjung Sta 0+000 S/D Sta 6+500)’, 2022, [Online]. Available: https://dspace.uii.ac.id/handle/123456789/40810
[10] M. Bahr and L. Laszig, ‘Productivity Development in the Construction Industry and Human Capital: A Literature Review’, Mar. 31, 2021. doi: 10.5121/civej.2021.8101.
[11] A. S. Hanna, C. S. Taylor, and K. T. Sullivan, ‘Impact of Extended Overtime on Construction Labor Productivity’, Journal of Construction Engineering and Management, vol. 131, no. 6, pp. 734–739, June 2005, doi: 10.1061/(ASCE)0733-9364(2005)131:6(734).
[12] B.-G. Hwang and C. Soh, ‘Trade-Level Productivity Measurement: Critical Challenges and Solutions’, Journal of Construction Engineering and Management, vol. 139, p. 04013013, Nov. 2013, doi: 10.1061/(ASCE)CO.1943-7862.0000761.
[13] K. Qi, E. K. Owusu, M.-F. Francis Siu, and P.-C. Albert Chan, ‘A systematic review of construction labor productivity studies: Clustering and analysis through hierarchical latent dirichlet allocation’, Ain Shams Engineering Journal, vol. 15, no. 9, p. 102896, Sept. 2024, doi: 10.1016/j.asej.2024.102896.
[14] L. Brescia-Norambuena, D. Pickel, M. González, S. L. Tighe, and G. Azúa, ‘Accelerated construction as a new approach for underground-mining pavement: Productivity, cost and environmental study through stochastic modeling’, Journal of Cleaner Production, vol. 251, p. 119605, Apr. 2020, doi: 10.1016/j.jclepro.2019.119605.
[15] M. Mirnayani and H. Paradiba, ‘The impact of overtime duration variations on labor productivity in apartment construction projects: A study on engineering and disaster management in the construction sector’, Calamity: A Journal of Disaster Technology and Engineering, vol. 2, Jan. 2025, doi: 10.61511/calamity.v2i2.2025.1321.
[16] A. Badawi Saluy et al., ‘Analysis of Labor Overtime and Productivity in Construction Projects’, vol. 17, p. 559, July 2023, doi: 10.5281/zenodo.7073499.
[17] H. Lingard and M. Turner, ‘Making time for life: A whole-of-industry initiative to reducing work hours and promoting health and gender inclusion in project-based construction work’, Project Leadership and Society, vol. 3, p. 100065, Dec. 2022, doi: 10.1016/j.plas.2022.100065.
[18] Q. Wong, N. M. Sapuan, and M. Khan, ‘The Impact of Safety and Health Towards Construction Workforce Productivity’, Journal of Governance and Integrity, vol. 6, pp. 504–514, May 2023, doi: 10.15282/jgi.6.1.2023.9114.
[19] M. Rahman and M. Murshed, ‘Sensitivity of Rigid Pavement Responses to Pavement Layer Thickness Due to Wheel Load: A Nonlinear Finite Element Study’, pp. 1–9, Jan. 2014, doi: 10.3759/ttea.v1i1.2797.
[20] C. Toth and A. Gulyás, Pavement Structures. 2023.
[21] Z. Haoran et al., ‘Integrated Design Optimization Method for Pavement Structure and Materials Based on Further Development of Finite Element and Particle Swarm Optimization Algorithm’, Construction and Building Materials, vol. 426, p. 136080, May 2024, doi: 10.1016/j.conbuildmat.2024.136080.
[22] D. C. Montgomery, E. A. Peck, and G. G. Vining, Introduction to Linear Regression Analysis. John Wiley & Sons, 2021.
[23] J. Hair, G. T. M. Hult, C. Ringle, and M. Sarstedt, A Primer on Partial Least Squares Structural Equation Modeling (PLS-SEM). 2022.
[24] M. H. Kutner, Applied Linear Statistical Models. McGraw-Hill Irwin, 2005.
[25] I. Ghozali, Aplikasi Analisis Multivariate Dengan Program SPSS versi 19. Semarang: Universitas Diponegoro, 2011.
[26] V. Sujarweni, Metodologi penelitian lengkap, praktis dan mudah dipahami/V, Wiratna Sujarweni. Pustaka Baru Press, 2014.
[27] G. Gautama, ‘Efektivitas Penggunaan Rigid Pavement (sta 140 + 000 S/D Sta 140+400) Pada Ruas Jalan Tol Bakauheni – Terbanggi Besar Provinsi Lampung’, Jan. 2017, doi: 10.24127/TAPAK.V6I2.426.
[28] D. E. Suyadi and F. Firdaus, ‘Perbandingan Produktivitas Alat Kerja Slipform Paver, Semi Slipform Paver Pada Pekerjaan Rigid Pavement’, Ensiklopedia Education Review, vol. 5, no. 3, pp. 314–318, Dec. 2023, doi: 10.33559/eer.v5i3.2050.
[29] S. R. Hidayanti and P. L. A. Luthan, ‘Produktivitas Alat Berat Concrete Paver Gomaco Pada Pekerjaan Rigid Pavement Di Proyek Pembangunan Jalan Tol Tebing Tinggi - Parapat’, Jurnal Engineering Development, vol. 1, no. 1 APR, pp. 52–56, Apr. 2021.